|
|
|
The data below is included for archival purposes. RIFT
Ship Name: Rift (Russia) US NODC Code: 90C1 Russian Academy of Sciences
Contact: Dr. Leonid Savostin,Director
Operator: P.P. Shirshov Institute of Oceanology
23, Krasikova
Moscow 117851 Russia
Phone: 1245996
Fax: 1245983
Cable:
Email:
Length (M): 53.71 Range (n. mi.): 6000 Crew: 13
Beam (M): 10.52 Endurance (days): 30 Officers: 14
Draft (M): 4.53 Cruise speed (kt): 10.0 Scientists: 11
Gross Tons: 781 Max. speed (kt): 11.6 Air Cond.: yes
Power (HP): 1320 Aux. Power (HP): 675
Main vessel activity
Oceanography
Year built: 81
Ocean area where vessel operates: Worldwide
Capacities and working spaces
Dry cargo holds: 0m3
Fuel: 156m3
Fresh water: 23m3
Wet laboratories (total area): 0m2
Dry laboratories (total area): 0m2
Fresh water generator capacity: 3m3
Freeboard to working deck: 0.0m
Free working deck area: 0m2
Space for container laboratory: 0m x 0m
Design Particulars
Hull materials: Steel
Energy sources
Main engine(s): number: 1 make: Diesel model:
Power (BHP) each main engine: 1320 at 428rpm
Diameter and max. rpm propeller: 2.150m 250rpm
Total power auxiliary diesels: 675HP
Electrical systems
AC Voltage: 0/ 380V, total 570kVA, 3phase, 50Hz
AC Voltage: 0/ 220V, total 100kVA, 3phase, 50Hz
DC Voltage: 220V, total 70V
Stabilized system for scientific equipment: 0VAC 0AMP 0Hz
Fixed equipment
Navigation and communication
Nav. equip: Radar Gyro EMLog
Comms:
Comm sat:
GPS:
Acoustic
Echosounders for scientific research: 12kHz
Sonar:
Provisions for silent ship operation:
Oceanographic
Oceanographic winches: number: 0
Steel wire length: 0m, safe working load: 0tons
Conducting cable length: 0m, safe working load: 0tons
Trawl winch length: 0m, safe working load: 0tons
Other, specify:
length: 0m, safe working load: 0tons
Gantry
Position:
Clearance above deck: 0m and outboard extension: 0m
Safe working load at max. reach: 0tons
Crane
Position:
Clearance above deck: 0m and outboard extension: 0m
Safe working load at max. reach: 0tons
Other winches for instruments or sampling: Winch For Submersible
Electronic data processing equipment permanently available on board
Computer:
Vessel construction and maintenance supervision
Construction supervised by:
Classification Society: RUSSIAN REGISTER
Others, specify:
Published vessel data
Magazine:
|