                             FY 95 OPERATING SCHEDULE
                      NOAA SHIP DELAWARE II/RTE CHARTER SHIP

POC: Chief, Operations Division                         LAST UPDATED: 08/09/94
     Atlantic Marine Center
     439 West York Street
     Norfolk, VA  23510
     TEL:  804-441-6206

                                                                          CUM
      DATES      PORTS            PROJECT INFORMATION   DAYS    PROGRAM   DAS

SHORT TERM CHARTERS BEGIN

DEP: 02/01/95    WOODS HOLE, MA   Charter               021     NMFS      065
ARR: 02/21/95    WOODS HOLE, MA   Marine Mammal Survey
                                  U.S. EAST COAST
      NOTE:  Departure from southern port desired.

DEP: 03/13/95    WOODS HOLE, MA   Charter               012     NMFS      077
ARR: 03/24/95    WOODS HOLE, MA   GLOBEC Stratification
                                  U.S. EAST COAST

DEP: 03/27/95    WOODS HOLE, MA   Charter               012     NMFS      089
ARR: 04/07/95    WOODS HOLE, MA   GLOBEC Mooring
                                  U.S. EAST COAST

LONG TERM CHARTER BEGINS
             
DEP: 04/10/95    WOODS HOLE, MA   Charter               012     NMFS      101
ARR: 04/21/95    WOODS HOLE, MA   COP Shakedown
                                  U.S. EAST COAST
      NOTE:  Can be reduced to 8-10 days.
                                      AND/OR

DEP: 04/10/95    WOODS HOLE, MA   Charter               012     NMFS      101
ARR: 04/21/95    WOODS HOLE, MA   GLOBEC Stratification                   (113)

Page No. 2
08/09/94

                              FY95 OPERATING SCHEDULE
                                CHARTER VESSEL(S)

                                                                          CUM
      DATES      PORTS            PROJECT INFORMATION   DAYS    PROGRAM   DAS

DEP: 04/24/95    WOODS HOLE, MA   Charter               012     NMFS      113
ARR: 05/05/95    WOODS HOLE, MA   COP                                     (125)
                                  U.S. EAST COAST
             
DEP: 05/08/95    WOODS HOLE, MA   Charter               019     NMFS      132
ARR: 05/26/95    WOODS HOLE, MA   COP                                     (144)
                                  U.S. EAST COAST

                                      AND/OR

DEP: 05/08/95    WOODS HOLE, MA   Charter               019     NMFS      132
ARR: 05/26/95    WOODS HOLE, MA   GLOBEC Stratification                   (163)
                                  U.S. EAST COAST

DEP: 05/30/95    WOODS HOLE, MA   Charter               016     NMFS      148
ARR: 06/14/95    WOODS HOLE, MA   MARMAP                                  (179)
                                  U.S. EAST COAST

DEP: 06/19/95    WOODS HOLE, MA   Charter               013     NMFS      161
ARR: 07/01/95    WOODS HOLE, MA   COP                                     (192)
                                  U.S. EAST COAST

DEP: 07/12/95    WOODS HOLE, MA   Charter               016     NMFS      177
ARR: 07/27/95    WOODS HOLE, MA   MARMAP                                  (208)
                                  U.S. EAST COAST

DEP: 08/07/95    WOODS HOLE, MA   Charter               013     NMFS      190
ARR: 08/19/95    WOODS HOLE, MA   COP                                     (221)
                                  U.S. EAST COAST

DEP: 08/21/95    WOODS HOLE, MA   Charter               040     NMFS      230
ARR: 09/29/95    WOODS HOLE, MA   Apex Predator Survey                    (261)
                                  U.S. EAST COAST

CRITICAL UNMET NEEDS:

  1)  As noted in the above schedule, two ships are required during April 10 -
      21; one to support the Coastal Ocean Program (COP), another to support
      the Global Ocean Ecosystems Dyanamics (GLOBEC) Program.  (Since the long
      term charter vessel will have the EK-500, it is preferrable to conduct
      the COP cruise on that vessel and the GLOBEC cruise on another vessel
      that must be capable of deploying the 10 m2 MOCNESS sampler.)

  2)  As noted in the above schedule, two ships are required during May 8 - 26;
      one to support the COP, another to support GLOBEC.  (Since the long term
      charter vessel will have the EK-500, it is preferrable to conduct the COP
      cruise on that vessel and the GLOBEC cruise on another vessel that must
      be capable of deploying the 10 m2 MOCNESS sampler.)

ADDITIONAL UNMET NEEDS:

  3)  A GLOBEC Cruise to conduct Turbulence Studies is needed during April 25 -
      May 5, 1994.

  4)  A GLOBEC Cruise to conduct Turbulence Studies is needed during May 30 -
      June 9, 1994.

  5)  An additional 60 DAS are needed during July-August 1995 for a Marine
      Mammal Survey to be conducted in the Mid-Atlantic Ocean.