|
|
|
The data below is included for archival purposes. Shana_rae
Ship Name: Shana Rae (USA) US NODC Code: 32R0 Monterey Canyon Research Vessels, Inc.
Contact: James C. Christmann
Operator:
114 Mason St.
Santa Cruz, CA 95060 USA
Phone: 408 4234864
Fax: 4231719
Cable:
Email:
Length (M): 16.00 Range (n. mi.): 1300 Crew:
Beam (M): 5.00 Endurance (days): 20 Officers: 2
Draft (M): 2.00 Cruise speed (kt): 8.0 Scientists: 4
Gross Tons: 46 Max. speed (kt): 10.0 Air Cond.: yes
Power (HP): 350 Aux. Power (HP):
Main vessel activity
Oceanography Monitoring,Prototype Development
Year built: 80
Ocean area where vessel operates: Pacific, Eastern Central
Capacities and working spaces
Dry cargo holds: 40m3
Fuel: 10m3
Fresh water: 2m3
Wet laboratories (total area): 12m2
Dry laboratories (total area): 10m2
Fresh water generator capacity: 0m3
Freeboard to working deck: 1.0m
Free working deck area: 25m2
Space for container laboratory: 3m x 5m
Design Particulars
Hull materials: GRP
Energy sources
Main engine(s): number: 1 make: Diesel model:
Power (BHP) each main engine: 350 at 1800rpm
Diameter and max. rpm propeller: 1.300m 650rpm
Total power auxiliary diesels: 0HP
Electrical systems
AC Voltage: 110/ 220V, total 20kVA, 3phase, 60Hz
AC Voltage: 110/ 220V, total 6kVA, 3phase, 60Hz
DC Voltage: 0V, total 0V
Stabilized system for scientific equipment: 110VAC 60AMP 60Hz
Fixed equipment
Navigation and communication
Nav. equip: Radar Loran SatNav
Comms:
Comm sat:
GPS:
Acoustic
Echosounders for scientific research: 0kHz
Sonar:
Provisions for silent ship operation:
Oceanographic
Oceanographic winches: number: 0
Steel wire length: 1000m, safe working load: 1tons
Conducting cable length: 0m, safe working load: 0tons
Trawl winch length: 0m, safe working load: 0tons
Other, specify: Stainless Wire
length: 150m, safe working load: 2tons
Gantry
Position: Stern
Clearance above deck: 3m and outboard extension: 1m
Safe working load at max. reach: 3tons
Crane
Position: Midships
Clearance above deck: 2m and outboard extension: 2m
Safe working load at max. reach: 0tons
Other winches for instruments or sampling:
Electronic data processing equipment permanently available on board
Computer:
Vessel construction and maintenance supervision
Construction supervised by:
Classification Society:
Others, specify:
Published vessel data
Magazine: Sea Technology Date: 01-jan-1993
|