|
|
Vessel
Data and Contact Information for the
Lance
Last Updated -
5/3/2001
|
Main
Activities
Dimensions
Capacities & Workspaces
Range, Speed, Endurance
Accommodations
DP Equipment
CTD Specs
Coring Specs
Underwater
Vehicles
Diving Capabilities
Engineering Design
Navigation & Communications
Acoustics & Profiling
Winches, Gantries & Cranes
Construction |
Country: |
Norway
|
NODC
Code:
|
58LA
|
| |
|
Call Sign: |
LGKI
|
| Owner: |
Norwegian Polar Institute
|
| Operator: |
Troms Fylkes Dampskibsselskap
|
| Contact: |
Oystein Mikelborg
|
| Address: |
Norwegian Polar Institute Polar Environment Center N-9296 Tromso, Norway
|
| Telephone: |
+47 77 75 05 63
|
| Fax: |
+47 95 61 29 36
|
| Email: |
mikelborg@npolar.no |
| Year
Built: |
1978
|
| Ship
URL: |
Link to Ship Home Page
|
|
Ship
Schedule URL:
|
Ship Schedule via its Home Page
|
|
Back
to Top
|
Main
Dimensions
|
| |
Length
OA: |
60.8
m
|
| |
Breadth: |
12.6
m
|
| |
Freeboard
to working deck: |
3
m
|
| |
Max.
draft: |
6.5
m
|
|
|
|
|
Back
to Top
|
Main
Vessel Activity
|
| |
Main
Activity: |
Oceanography, marine biology, logistic support
|
| |
Operating
Area: |
Primarily arctic (Svalbard), secondarily Antarctica
|
| |
Navy
Grids Supported: |
|
| |
|
|
Back
to Top
|
Capacities
and Working Spaces
|
| |
Gross
tonnage: |
1334
GRT
|
| |
Dry
cargo holds: |
615
m3
|
| |
Fuel: |
700
m3
|
| |
Wet
Labs Area: |
25
m2
|
| |
Dry
Lab Area: |
46
m2
|
| |
Fresh
Water
Storage Capacity: |
70
m3
|
| |
Fresh
Water Generator Capacity: |
10
m3/day
|
| |
Scientific
Clean Water Generation: |
No
|
| |
Free
Working Deck Area: |
180
m2
|
| |
Space
for container lab: |
One 20' containerlab on main deck
m
|
| |
Radioactive
Isotope Work Areas: |
No
m
|
| |
|
|
Back
to Top
|
Range,
Speed and Endurance
|
| |
Range: |
21000
nautical miles
|
| |
Cruising
Speed: |
10.5
kts.
|
| |
Max.
Speed: |
13.7
kts.
|
| |
Endurance: |
85
days
|
|
|
|
|
Back
to Top
|
Accommodation
|
| |
Officers: |
6
|
| |
Other
crew: |
7
|
| |
Scientists: |
25
|
| |
Air
Conditioned: |
No
|
| |
|
|
|
Back
to Top
|
Data
Processing Equipment:
|
| |
Computers: |
3 Pentium III (450-733 mHz)
|
| |
Printing/Plotting: |
b/w laser printer, colour inkjet printer
|
| |
|
|
|
Back
to Top
|
CTD
Specifications:
|
| |
CTD
Aboard: |
Seabird 911
|
| |
CTD
Type: |
Unknown
|
| |
CTD
Tow able: |
No
|
| |
CTD
Oxygen Sensing: |
No
|
| |
CTD
Transmissivity: |
No
|
| |
CTD
Fluormeter: |
Yes, Wetstar
|
| |
CTD
Rosette: |
SBE 32 12x8 liter bottles
|
| |
|
|
|
Back
to Top
|
Coring
Specifications:
|
| |
Coring
Capabilities Aboard: |
Can operate coring equipment. However no coring equipment permanently onboard
|
| |
Grab
Sampler: |
No
|
| |
Box
Corer: |
No
|
| |
Gravity
Corer: |
No
|
| |
Piston
Corer: |
No
|
| |
Multi
Corer: |
No
|
| |
|
|
|
Back
to Top
|
Underwater
Vehicle Capabilities:
|
| |
Underwater
Vehicle Support: |
No
|
| |
ROVs: |
No
|
| |
AUVs: |
No
|
| |
Submersibles: |
No
|
| |
|
|
|
Back
to Top
|
Diving
Support:
|
| |
Diving
Capabilities: |
300 bar compressors
|
| |
|
|
|
Back
to Top
|
Engineering
Design Particulars
|
|
|
Ice
Breaking Ability:
|
Yes, DnV ICE 1A certificate
|
|
|
Hull
Materials:
|
|
Steel
|
|
| |
Dynamic
Positioning Ability: |
Unknown
|
| |
Engines: |
Main engine(s):
number:
1
make:
MAK 453
Power (BHP) each engine:
3200
Propeller Diameter:
2.75
m Max. RPM:
240
Total power auxiliary diesels:
1740
HP |
| |
Electrical
Systems: |
|
|
|
AC
|
Voltages: |
380V and 220V
|
| |
|
kVA: |
1600
|
| |
|
Phases: |
3/3
|
| |
|
Frequency:
|
50/50
Hz
|
|
|
|
Stabilized
System:
VAC
Unknown
AMPs
Unknown
Hz
|
|
|
DC
|
Unknown
Volts with
Unknown
Volts Max
|
| |
|
|
|
|
|
Fixed
Equipment
|
|
Back
to Top
|
Navigation
and Communication:
|
| |
Navigational
Equipment: |
Transas NaviSailor electronic chart system, Norcontrol databridge
|
| |
Communications
Equipment: |
Sailor 2000 series radio station covering GMDSS A3 area
|
| |
Satellite
Communications Equipment: |
Inmarsat A, Inmarsat C, Iridium
|
| |
GPS: |
GPS and DGPS
|
| |
|
|
|
Back
to Top
|
Acoustics
and Profiling:
|
| |
Echosounders: |
7, 18, 38, 50 and 120 kHz
|
| |
Sonar
Type: |
Furuno CSH 20
|
| |
Sea
Surface Mapping System: |
No
|
| |
Side
Scanning: |
Not permanently. Winch with 1500m cable and recovery boom installed.
|
| |
Multibeam: |
none
|
| |
Acoustic
Doppler Current Profiler: |
RD Instruments BB 150 WM
|
| |
Silent
Ship Operations: |
No
|
| |
|
|
|
Back
to Top
|
Oceanographic:
|
| |
Winches: |
1
|
|
| |
|
Steel
Wire Length:
6000
m,
safe working load:
13.5
tons
|
| |
|
Conducting
Cable Length:
5000
m
, safe working load:
1.5
tons
|
| |
|
Trawl
winch length:
1000
m
, safe working load:
10
tons
|
| |
|
Other
Winches: |
| |
|
|
Length:
Unknown
, safe working load:
Unknown
|
| |
|
|
| |
Gantry: |
Position: |
Main deck, port side
|
| |
|
|
Clearance
above deck:
4.2
m
, and outboard extension:
4.2
m
|
| |
|
|
Safe working
load at maximum reach:
1.5
tons
|
| |
|
|
|
| |
Crane: |
Position: |
Main deck
|
| |
|
Clearance
above deck:
Unknown
and outboard extension:
9
m
|
| |
|
|
Safe working
load at maximum reach:
10
tons
|
| |
|
|
|
| |
Other: |
|
Unknown
|
| |
|
|
|
|
Back
to Top
|
Vessel
Construction and Maintenance Supervision
|
| |
Construction
Supervised by: |
Det Norske Veritas
|
| |
Classification
Society: |
Det Norske Veritas: Det Norske Veritas +A1, ICE -1
|
| |
Others,
Specify: |
HELDK, OILREC, E 0
|
| |
|
|
|
|