The data below is included for archival purposes.
The most current data that we have is available via our new searchable
database of ships at:
http://oceanic.cms.udel.edu/ships/
Ship Name: Gal Mae Gi (Korea, Rep. of) US NODC Code: Korea Fishing Training Centre
Contact: Mr. Kim Ki Tae,Director
Operator: Korea Fishing Training Centre
Young Do Gu, Nam Hang Dong 2ga 16
YONG DO,P.O.BOX 20
Pusan 606032 Korea, Rep. Of
Phone: 051 413-0880
Fax: 413-0890
Cable: COFIS,PUSAN
Email:
Length (M): 52.20 Range (n. mi.): 11000 Crew: 4
Beam (M): 8.30 Endurance (days): 40 Officers: 7
Draft (M): 3.60 Cruise speed (kt): 11.6 Scientists: 42
Gross Tons: 370 Max. speed (kt): 13.2 Air Cond.: yes
Power (HP): 1200 Aux. Power (HP): 760
Main vessel activity
Fisheries
Year built: 89
Ocean area where vessel operates: Pacific, Northwest; Pacific, Northeast
Capacities and working spaces
Dry cargo holds: 0m3
Fuel: 290m3
Fresh water: 46m3
Wet laboratories (total area): 0m2
Dry laboratories (total area): 0m2
Fresh water generator capacity: 3m3
Freeboard to working deck: 1.9m
Free working deck area: 0m2
Space for container laboratory: 0m x 0m
Design Particulars
Hull materials: Steel
Energy sources
Main engine(s): number: 1 make: Diesel model:
Power (BHP) each main engine: 1200 at 380rpm
Diameter and max. rpm propeller: 2.600m 180rpm
Total power auxiliary diesels: 760HP
Electrical systems
AC Voltage: 225/ 0V, total 320kVA, 3phase, 60Hz
AC Voltage: 225/ 0V, total 320kVA, 3phase, 60Hz
DC Voltage: 24V, total 0V
Stabilized system for scientific equipment: 0VAC 0AMP 0Hz
Fixed equipment
Navigation and communication
Nav. equip: Radar Loran SatNav Gyro EMLog
Comms:
Comm sat:
GPS:
Acoustic
Echosounders for scientific research: 0kHz
Sonar:
Provisions for silent ship operation:
Oceanographic
Oceanographic winches: number: 0
Steel wire length: 0m, safe working load: 0tons
Conducting cable length: 0m, safe working load: 0tons
Trawl winch length: 0m, safe working load: 0tons
Other, specify:
length: 0m, safe working load: 0tons
Gantry
Position:
Clearance above deck: 0m and outboard extension: 0m
Safe working load at max. reach: 0tons
Crane
Position:
Clearance above deck: 0m and outboard extension: 0m
Safe working load at max. reach: 0tons
Other winches for instruments or sampling:
Electronic data processing equipment permanently available on board
Computer:
Vessel construction and maintenance supervision
Construction supervised by:
Classification Society: KOREAN REGISTER OF SHIPG.
Others, specify:
Published vessel data
Magazine:
|