Vessel
Data and Contact Information for the
Tangaroa
Last Updated -
8/15/2001
|
Main Activities
Dimensions
Capacities & Workspaces
Range, Speed, Endurance
Accommodations
DP Equipment
CTD Specs
Coring Specs
Underwater
Vehicles
Diving Capabilities
Engineering Design
Navigation & Communications
Acoustics & Profiling
Winches, Gantries & Cranes
Construction
|
Country: |
New Zealand
|
NODC
Code:
|
Unknown
|
|
|
Call Sign: |
ZMFR
|
Owner: |
National Institute of Water and Atmospheric Research Limited (NIWA) - NIWA Vessel Management Limited
|
Operator: |
NIWA Vessel Management Limited
|
Contact: |
Mr Clive Glover, General Manager
|
Address: |
301 Evans Bay Parade, Greta Point P O Box 14 901, Kilbirnie Wellington, New Zealand
|
Telephone: |
+ 64 4 386 0300
|
Fax: |
+ 64 4 386 0555
|
Email: |
c.glover@niwa.cri.nz |
Year
Built: |
1991
|
Ship
URL: |
Link to Ship Home Page
|
Ship
Schedule URL:
|
Unknown
|
Back
to Top
|
Main
Dimensions
|
|
Length
OA: |
70
m
|
|
Breadth: |
13.8
m
|
|
Freeboard
to working deck: |
1
m
|
|
Max.
draft: |
7.2
m
|
|
|
Back
to Top
|
Main
Vessel Activity
|
|
Main
Activity: |
Marine Science
|
|
Operating
Area: |
Mainly within South Pacific, New Zealand Continental Shelf and Antarctic Region
|
|
Navy
Grids Supported: |
|
|
|
Back
to Top
|
Capacities
and Working Spaces
|
|
Gross
tonnage: |
2282
GRT
|
|
Dry
cargo holds: |
485
m3
|
|
Fuel: |
681
m3
|
|
Wet
Labs Area: |
120
m2
|
|
Dry
Lab Area: |
240
m2
|
|
Fresh
Water
Storage Capacity: |
82
m3
|
|
Fresh
Water Generator Capacity: |
10
m3/day
|
|
Scientific
Clean Water Generation: |
filtered
|
|
Free
Working Deck Area: |
200
m2
|
|
Space
for container lab: |
yes
m
|
|
Radioactive
Isotope Work Areas: |
yes
m
|
|
|
Back
to Top
|
Range,
Speed and Endurance
|
|
Range: |
18000
nautical miles
|
|
Cruising
Speed: |
12.5
kts.
|
|
Max.
Speed: |
16
kts.
|
|
Endurance: |
60
days
|
|
|
Back
to Top
|
Accommodation
|
|
Officers: |
5
|
|
Other
crew: |
8
|
|
Scientists: |
25
|
|
Air
Conditioned: |
No
|
|
|
|
Back
to Top
|
Data
Processing Equipment:
|
|
Computers: |
Datacom, Unix-Dos Network
|
|
Printing/Plotting: |
Unknown
|
|
|
|
Back
to Top
|
CTD
Specifications:
|
|
CTD
Aboard: |
Seabird 911plus system is mobilised as required
|
|
CTD
Type: |
Seabird 911plus
|
|
CTD
Tow able: |
no
|
|
CTD
Oxygen Sensing: |
yes
|
|
CTD
Transmissivity: |
yes
|
|
CTD
Fluormeter: |
yes
|
|
CTD
Rosette: |
yes
|
|
|
|
Back
to Top
|
Coring
Specifications:
|
|
Coring
Capabilities Aboard: |
Rock dredges, grab samplers and bottom corers mobilised as required
|
|
Grab
Sampler: |
yes
|
|
Box
Corer: |
yes
|
|
Gravity
Corer: |
yes
|
|
Piston
Corer: |
yes
|
|
Multi
Corer: |
yes
|
|
|
|
Back
to Top
|
Underwater
Vehicle Capabilities:
|
|
Underwater
Vehicle Support: |
Unknown
|
|
ROVs: |
Unknown
|
|
AUVs: |
Unknown
|
|
Submersibles: |
Unknown
|
|
|
|
Back
to Top
|
Diving
Support:
|
|
Diving
Capabilities: |
Unknown
|
|
|
|
Back
to Top
|
Engineering
Design Particulars
|
|
Ice
Breaking Ability:
|
Ice strengthened hull (DNV Ice 1C)
|
|
Hull
Materials:
|
Steel
|
|
|
Dynamic
Positioning Ability: |
Unknown
|
|
Engines: |
Main engine(s):
number:
1
make:
Wartsila Vasa 8R 32D
Power (BHP) each engine:
4000 at 750rpm
Propeller Diameter:
4.6
m Max. RPM:
130
Total power auxiliary diesels:
1600
HP |
|
Electrical
Systems: |
|
|
AC
|
Voltages: |
0/440V /240V
|
|
|
kVA: |
Unknown
|
|
|
Phases: |
3/1
|
|
|
Frequency:
|
60/60
Hz
|
|
|
Stabilized
System:
Unknown
VAC
Unknown
AMPs
Unknown
Hz
|
|
DC
|
24V
Volts with
Unknown
Volts Max
|
|
|
|
|
|
Fixed
Equipment
|
Back
to Top
|
Navigation
and Communication:
|
|
Navigational
Equipment: |
Radars, SatNav, Gyro, Autopilot, Video plotter, DopLog, echo sounders
|
|
Communications
Equipment: |
Cell phone/fax (64 25 427 510), Satcom, Radio,
|
|
Satellite
Communications Equipment: |
Satcom system B (voice - 008 72 3 512 01127, fax- 008 72 3 512 01128, data- 008 72 3 512 01129, HSD- 008 72 3 512 01788, email - tangaroa@niwa.cri.nz) Satcom system C (email - 451200427@telstra.ves.net)
|
|
GPS: |
Magnavox 4200, Furuno GP 500, Ashtech 3DF ADU,
|
|
|
|
Back
to Top
|
Acoustics
and Profiling:
|
|
Echosounders: |
Simard EK 500 (12, 27, 38, 120 kHz), Simrad EA 500 (12, 120 kHz), Kaijo Denki KMC 2000 (12kHz)
|
|
Sonar
Type: |
sub bottom profiler ORE model 140 (3.5kHz).
|
|
Sea
Surface Mapping System: |
Unknown
|
|
Side
Scanning: |
Klein dual frequency towed system (mobilised as required)
|
|
Multibeam: |
Simrad EM300 (30kHz) with velocity profiler & TSS POS/MV motion sensor
|
|
Acoustic
Doppler Current Profiler: |
RDI Broad Band acoustic profiler (150 kHz)
|
|
Silent
Ship Operations: |
Unknown
|
|
|
|
Back
to Top
|
Oceanographic:
|
|
Winches: |
10
|
|
|
|
Steel
Wire Length:
2500
m,
safe working load:
12
tons
|
|
|
Conducting
Cable Length:
1200
m
, safe working load:
0
tons
|
|
|
Trawl
winch length:
4000
m
, safe working load:
12
tons
|
|
|
Other
Winches: |
|
|
|
Length:
Unknown
, safe working load:
Unknown
|
|
|
|
|
Gantry: |
Position: |
Stern, Midships A frame
|
|
|
|
Clearance
above deck:
6
m
, and outboard extension:
Unknown
|
|
|
|
Safe working
load at maximum reach:
5
tons
|
|
|
|
|
|
Crane: |
Position: |
3 Seacrans - Stern, Midships
|
|
|
Clearance
above deck:
7
m
and outboard extension:
7
m
|
|
|
|
Safe working
load at maximum reach:
1
tons
|
|
|
|
|
|
Other: |
|
CTD winch 2000-3000m
|
|
|
|
|
Back
to Top
|
Vessel
Construction and Maintenance Supervision
|
|
Construction
Supervised by: |
Unknown
|
|
Classification
Society: |
DNV
|
|
Others,
Specify: |
Lloyds Safe Ship Management system
|
|
|
|